Project Name:
Demolition of oncology department and new build of mri center
The Owner’s Past Performance Questionnaire stated “Richard Group is the best contractor in my 27 years of Federal Experience.” Richard received the highest customer satisfaction ratings in each project category to include management, safety, timeliness, cost control, and schedule.
-US FEDERAL CUSTOMER
- Location // Illinois - North
- Sector // Public - Federal
- Architect // PFB Architects
- Size // 2,000 - 5,000 SF
- Hours // 15,000+
- Practice // MRI Center - IT Rooms - CRAC Mechanical - Healthcare Equipment Installation - Patient Care
Public Health Care


making room to reduce wait times for traumatic brain injuries
More than 70 trade professionals contributed to this fast-paced Design-Bid-Build project, which featured a 180-day period of performance where Richard Group completed demolished, abated, and then renovated within an occupied by the Radiology Department. The project provided the installation of a new Siemens MRI scanner with state-of-the-art lighting for patient experience.
As part of the project, Richard demolished the loading dock façade, which consisted of two 18” cast-in-place concrete walls in order to maneuver the Siemens MRI into the hospital as there were no openings large enough to fit the unit.
More Richard Projects

Penthouse Revitalization
Interior Water Upgrade