Replace Existing Flooring and Substructure at DCO

RichardStars

Replace Existing Flooring and Substructure at DCO

LOCATION
Illinois –Central
SECTOR
Public – Federal
ARCHITECT

SIZE
sf
CONTRACT VALUE
$0 – $1,000,000
PRACTICE

COMPLEXITYThis project include the repair of subflooring, walls, removal of existing access flooring and elevated support system (stringer, pedestal, pedestal head, base, base adhesive, ramps, steps, guard rails system, CRAC unit supply air registers/grilles), Installation of new access flooring on elevated support system (access panels with high pressure laminated covering, fabricated cut-outs floor panel with grommet, ramps and steps, railing and posts, perforated panels, pedestal, pedestal base and head, base adhesive, bolted stringer, CRAC unit supply  Air Flow Panel).

This new facility allows better supervision of inmates, provides more safety for staff and offenders, and emphasizes movement of high-security offenders to lower custody levels.

Our other Projects

Middleton VA 8-25-16 001
Project Name
Middleton VA 8-25-16 001
Project Name
Middleton VA 8-25-16 001
Project Name
Scroll to Top