LOCATION Illinois – Central SECTOR Public – Federal ARCHITECT Nagel Architects and Engineers SIZE 1,000 sf CONTRACT VALUE $0 – $1,000,000 PRACTICE
COMPLEXITYThis 75-day project required Richard to install three tandem Armstrong steam bundles and demolish the existing united located on the lower level of Building 200. The original units had been improperly connected to the Johnson Control BAS Metasys. At no additional cost the VA, Richard provided a design to allow the BAS system to monitor thermal regulation and take the current system out of manual mode; something the system had been in for at least seven years. AWESOME SAUCE QUOTE OR STATISTIC Existing system leaking/Diverted water during construction.