COMPLEXITYThe project involved replacing critical main line pipes delivering steam / condensate to (2) separate buildings, separated by a main arterial road for the VA’s southern campus. After excavation, new pipes replaced existing, the road / sidewalks were re-built, and the site was restored within a 3 -month period.