COMPLEXITY This project includes additional electrical capacity to Building 200 via new distribution gear. This includes 4160-volt transformers, downstream switchboards, automatic transfer switches, and panel boards. The new equipment will power the new chillerplant for the building.
AWESOME SAUCE QUOTE OR STATISTIC
This project includes a deep (23 FT) exterior excavation south of Bldg. 200 to accommodate the electrical conduit penetration from the inside of the building. There is existing switchgear adjacent to the excavated pit which we will need to stabilize to ensure it is not affected by our work